5. Primary beam corrected images
Back
tt0 when multi-term
VLASS3.1.sb43608267.eb43637455.59987.9706687963_split_split.ms
VLASS3.1.ql.T25t03.J031456+593000.10.2048.v1.I.iter1
restored
residual
maximum
5.7148e-02 Jy/beam
2.2302e-03 Jy/beam
minimum
-2.1078e-03 Jy/beam
-2.2864e-03 Jy/beam
sigma
1.9314e-04 Jy/beam
1.9736e-04 Jy/beam
MAD rms
1.5386e-04 Jy/beam
1.4886e-04 Jy/beam
VLASS3.1.ql.T25t03.J031456_593000.10.2048.v1.I.iter1.image.pbcor.tt0.sky.png
VLASS3.1.ql.T25t03.J031456_593000.10.2048.v1.I.iter1.image.residual.pbcor.tt0.sky.png
VLASS3.1.ql.T25t03.J031456_593000.10.2048.v1.I.iter1.pb.tt0.sky.png
VLASS3.1.ql.T25t03.J031456+593000.10.2048.v1.I.iter1.pb.tt0.hist.png
Pipeline QA
No pipeline QA for this task.
Input Parameters
output_dir
/mnt/condor/execute/dir_3098/working
vis
/mnt/condor/execute/dir_3098/working/VLASS3.1.sb43608267.eb43637455.59987.9706687963_split_split.ms
Tasks Execution Statistics
Start time
2023-11-08 05:47:45.948
End
2023-11-08 05:47:48.643
Duration
0:00:02.695
Note, WebLog generation is not included in the time.
CASA logs for stage 5
View
or
download
stage5/casapy.log (5.2 KB)